Milwaukee cleanout to hardwood estimate checklist

Use this when one crew is clearing a room and a flooring contractor needs to see what is underneath. Decide what stays first, then get a written estimate for each job.

Use your browser’s print menu for a blank worksheet. Fill it in offline and keep access codes out of the copy you share.

Compare two cleanout estimates using the same load count.

Before the cleanout

Record the room handoff

Room and target handoff date
Items staying or moving and who handles them
Items on hold and who can clear them
Agreed removal scope and any exclusions
Carry-out route and loading access
Observation date and floor areas still covered
Visible floor condition and moisture concerns
Flooring estimate stairs, steps and landings
Inspection time and who confirms the room is ready

Before approving the flooring estimate

Compare two written cleanout estimates

Use the same load size and the same rooms. Enter other charges such as stairs or disposal if they are outside the base price. Leave an unknown amount blank. Enter zero only when the estimate confirms there is no separate charge.

Example. One eligible load at $650 is lower than $790 for the same work. If a second load costs $200 extra on the first estimate and is included in the second, the totals are $850 and $790.