Ask when the last coat went down and confirm how conditions in the room affect the published times. If the finish name is unclear or the instructions differ, ask your installer for the time in writing.
Bona Traffic HD
U.S. technical data sheet. Confirm the schedule in cooler or more humid rooms.
Confirm for your floor. Ask the installer for a furniture return time. The sheet gives pad guidance and a separate walking time. Bona US technical data sheet
Confirm for your floor. Confirm a separate time for furniture. The care section calls for felt pads and careful placement. LOBA US satin technical data sheet
Rugs and mats
Wait for final cure before setting rugs or carpets on the finish. Check pad compatibility with the installer. LOBA US satin technical data sheet
Routine cleaning
The care section holds off water and detergent for the first week and calls for full cure before damp cleaning. LOBA US satin technical data sheet
Full cure
The US satin sheet lists 3 days under the stated conditions. Ventilation, humidity, temperature and coat thickness can extend it. LOBA US satin technical data sheet
Rubio Monocoat Oil Plus 2C
U.S. guidance for the two-part system. Confirm whether Part B was used.
Walking
The care note gives about 24–36 hours for light use under favorable conditions. The flooring FAQ specifies clean, dry socks for early walking. Rubio US cure-time guidance
Furniture
The flooring FAQ lists 48 hours for furniture. It excludes rugs and mats at that point. Rubio US flooring FAQ
Rugs and mats
Confirm for your floor. The FAQ excludes rugs and mats at the 48-hour furniture milestone. Ask for the actual rug and pad return date. Rubio US flooring FAQ
Routine cleaning
Confirm for your floor. The flooring FAQ lists about 5 days to full cure and liquid resistance. Confirm the first damp cleaning date and product separately. Rubio US flooring FAQ
Full cure
Rubio lists about 5 days with Part B and about 21 days when Part A was used alone. Rubio US cure-time guidance
PALLMANN PALL-X GOLD
July 2026 product data sheet for the North American product.
Walking
Published times differ. The sheet lists 3–4 hours in the drying table and 24 hours in the cure instructions. Get a written walking time from the installer for this floor. PALLMANN July 2026 product data sheet
Furniture
Confirm for your floor. Ask the installer to confirm a separate furniture return time for the installed finish. PALLMANN July 2026 product data sheet
Confirm for your floor. The sheet describes careful furniture placement while the surface can still mar. Confirm the date and handling for your furniture. StreetShoe NXT technical data sheet
Confirm for your floor. The technical sheet gives dry dusting for the first 7 days and discusses a separate 2-week window for liquid cleaners. Confirm the first damp or cleaner use. StreetShoe NXT technical data sheet
Confirm for your floor. The instructions give a one-week restriction for rugs, cleaners, spills and heavy traffic. Confirm full cure separately for your floor. DuraSeal Waterbased Polyurethane instructions
Print a copy. Write the date and time or “ask installer” for each activity. Save the installer’s instructions and a photo of the product label with the record.